Bowmanville • Project planning
Separate the boards from the heavy parts.
Deck and fence projects can produce long boards, panels, hardware and heavy footings. List each material separately before arranging a rental bin. Treated timber and concrete require specific discussion; do not assume they belong in one mixed load. This is disposal-planning guidance, not a promise that Bin and Gone will perform the demolition.
- Identify treated or painted wood
- Measure long boards and panels
- Do not mix in unapproved footings

What should be separated before booking?
Distinguish deck boards, fence panels, structural posts, metal fittings and concrete bases. The material mix can matter more than the number of sections being removed. Keep landscaping material and soil out of the planned timber load unless specifically approved.
Describe coatings and treatment where known. Painted wood, pressure-treated lumber and composite boards should not be described simply as clean wood. If you do not know the material, say so and ask how it should be assessed.
- Wood type and any treatment or coating
- Longest boards and largest panels
- Metal fittings and attached hardware
- Footings or other dense material
How does length affect the bin choice?
A pile can look modest while containing pieces too long to sit below a bin's rim. Measure the longest rigid pieces and ask about the actual usable interior. Do not use a cubic-yard estimate as proof that panels or boards will fit.
Dismantling or cutting work should be planned by someone able to do it safely. The rental does not include teardown or preparation by default. Keep sharp hardware from creating hazards along the carrying route, and follow the provider's loading directions.
What can change the disposal plan?
Unexpected concrete, soil or contaminated material can turn a straightforward-looking timber job into a different load. Contact the provider before adding those materials. The current guidance excludes cinder blocks and hazardous materials, and does not offer blanket concrete acceptance.
Arrange delivery when approved debris will be ready and collection when the loading work can realistically be completed. Outdoor project delays should be discussed before the rental period ends rather than assumed to be included.
A couple of common questions.
Does booking the bin include removing the deck?
No. Teardown, disconnection, cutting and loading labour must be separately arranged and confirmed. A bin booking is not a demolition contract.
Can fence-post concrete go in with the wood?
Not without explicit approval. Tell the provider about the concrete before booking and keep it separate while suitability and disposal arrangements are checked.